Reshaping the Future

Authors

  • Jill Beard
  • David Ball

DOI:

https://doi.org/10.18352/lq.7921

Keywords:

Refurbishment, Academic Libraries, New Build, Adaptable Library Design

Abstract

A 5.3 million pounds sterling refurbishment and new build library project was undertaken by Bournemouth University. First inception to latest adaptation spans 2000–2008. The project gave equal weight to the refurbishment and new build and the building was opened in 2003. The philosophy was one of seeking a design that would allow adaptation and change. Winning the SCONUL building award 2007 is testament to the success of designing and implementing space and service delivery in a way that is sympathetic to developing pedagogy, student expectations and the University's plans.

Downloads

Download data is not yet available.

Downloads

Published

2008-09-01

Issue

Section

Building on Experience: the Architecture Conference

How to Cite

Beard, J., & Ball, D. (2008). Reshaping the Future. LIBER Quarterly: The Journal of the Association of European Research Libraries, 18(2), 199-208. https://doi.org/10.18352/lq.7921